Manufactured in Malaysia since 2005 · SIRIM · MyHIJAU · SPAN certified · Shop online →
Warehouse Flooring

Warehouse & logistics floor coatings.

Forklifts, pallet jacks and constant pallet movement punish a warehouse slab. Bina lays a hard, dust-free epoxy floor with clear traffic-lane marking — built for the abrasion and easy to keep clean.

Forklift-tough
Dust-free
Traffic-lane marking
Easy-clean
20+Years manufacturing
4,100+Projects delivered
Mfr +Applicator in one
SIRIM+ MyHIJAU certified
The Environment

What a warehouse floor has to handle

Abrasion, dust and safe traffic flow.

Fork

Forklift abrasion

Hard wheels and turning forces grind down weak surfaces fast.

Dust

Concrete dusting

Bare slabs shed dust onto goods and racking — a sealed floor stops it.

Lane

Traffic safety

Marked aisles, walkways and bays keep people and trucks apart.

Recommended System

The build-up we’d specify

A mix-and-match system using real Bina products — confirmed to your slab and use.

Recommended build-up — Warehouse & Logistics

A mix-and-match system using real Bina floor products — confirmed to your slab and use.

1
Primer SF6303Seals the slab, locks down dust, blocks rising moisture.
2
Heavy-duty option — Epoxy mortar EM6304Add where forklift impact is severe (3–10 mm build).
Top
Epoxy floor coating EF6200Hard, dust-free, easy-clean wearing surface + traffic-lane marking.
Why this build

High abrasion from forklifts and pallet traffic. A primed epoxy coating gives a hard, dust-free, easy-clean floor; add the epoxy mortar where impact is severe. Line-marking defines safe traffic lanes.

Spec this floor →
FAQ

Common questions

Will the floor handle forklift traffic?

Yes — a primed epoxy coating handles most warehouse traffic; for severe impact we add an epoxy mortar build underneath.

Can you add line marking?

Yes — traffic lanes, walkways, racking bays and safety zones are marked as part of the floor.

How quickly can we use the floor again?

Layers typically take light traffic in about 16 hours and full traffic in around 48 hours, depending on temperature.

Get Started

Need a tougher warehouse floor?

Tell us the area, forklift traffic and whether you need line marking — we’ll quote it.

Manufacturer-grade resin system
Real datasheets & SIRIM / MyHIJAU
Supply & install, nationwide
Get a flooring quote on WhatsAppDownload TDS & SDS